Skip to content

Compliance

ISO 27001

ISO/IEC 27001:2022 never says "penetration test". Annex A controls 8.8 and 8.29 still require you to show that technical vulnerabilities are found and fixed, and a scoped, retested pentest is the evidence most certification auditors expect to see.

Who this applies to

Any organisation certified to ISO/IEC 27001, or preparing for a Stage 1 or Stage 2 certification audit, that has internet-facing systems, a product its customers log into, or an internal network holding the information in scope of the ISMS.

The 2013 edition is no longer certifiable. The transition period to ISO/IEC 27001:2022 ended on 31 October 2025, so every current certificate and every audit runs against the 2022 Annex A.

Whether a given system needs testing follows from your own risk assessment and Statement of Applicability (clause 6.1.3). If a control is in the SoA and the risk register says a system matters, the auditor will expect evidence that the control works on that system.

What it requires

Three Annex A controls are where a penetration test usually lands:

  • A 8.8 Management of technical vulnerabilities: obtain information about technical vulnerabilities, evaluate your exposure, and take appropriate measures. A pentest is the independent check that the scanning and patching process actually closes what matters.
  • A 8.29 Security testing in development and acceptance: define and carry out security testing during development, and before a system or major change goes live.
  • A 5.35 Independent review of information security: the approach to managing information security, including its technical controls, is reviewed independently at planned intervals and after significant change.

The standard sets no frequency. Annual testing of in-scope production systems, plus testing after major changes, is what most certification bodies treat as reasonable, and it lines up with the annual surveillance audit cycle.

What an auditor checks is the loop, not only the report: that findings were risk-rated, assigned, fixed within the timelines your own policy sets, and verified as fixed.

How the testing maps to it

We scope the test from your ISMS scope and risk register, so the systems tested are the systems the certificate covers. The report is written to be handed to an auditor as it stands.

  • An executive summary written for a non-technical reader, which is usually what the auditor reads first.
  • CVSS-scored findings with evidence, so severities map onto the risk ratings in your own vulnerability management procedure.
  • A technical annexure of everything tested, including what came back clean, which answers the "what was covered" question in one place.
  • One retest round with a signed closure letter, which is your evidence that A 8.8 is working rather than merely documented.

Testing should finish early enough to fix and retest before the audit window. Six to eight weeks ahead of Stage 2 or surveillance is a comfortable margin.

Common questions

Is penetration testing mandatory for ISO 27001?
Not by name. ISO/IEC 27001:2022 does not use the phrase. Annex A 8.8 requires technical vulnerabilities to be identified and addressed, and A 8.29 requires security testing before go-live, so in practice certification auditors expect a penetration test of in-scope systems.
How often should we run a pentest for ISO 27001?
The standard sets no frequency. Annually, and again after any significant change to an in-scope system, is the common expectation and matches the yearly surveillance audit.
Which Annex A controls does a penetration test provide evidence for?
Mainly A 8.8 (management of technical vulnerabilities) and A 8.29 (security testing in development and acceptance). It also supports A 5.35 (independent review of information security).
Does the auditor need the full report?
Most auditors ask for the executive summary, the list of findings with their severities, and proof of remediation. The full technical report usually stays with you. A signed retest closure letter is the strongest evidence that findings were actually fixed.
How long before the audit should testing happen?
Leave time to fix and retest. Finishing the test six to eight weeks before the Stage 2 or surveillance audit is a comfortable margin for most teams.

Need this for an audit deadline?

Send the scope and the date you need the report by. If the timeline is not realistic, we will say so rather than take the booking.